11 April 2025
SARAJI EAST COAL PROJECT – ROM STOCKPILE & PRODUCT STOCKPILE PADS
For the provision of run of the mine stockpile & product stockpile pads.
11 April 2025
SARAJI EAST COAL PROJECT – ROM STOCKPILE & PRODUCT STOCKPILE PADS
For the provision of run of the mine stockpile & product stockpile pads.
11 April 2025
SARAJI EAST COAL PROJECT – COAL HANDLING & PREPARATION PLANT
For the provision of a coal handling & preparation plant.
11 April 2025
SARAJI EAST COAL PROJECT – TAILINGS STORAGE FACILITY
Dewatered tailings & reject disposal facility within waste rock dumps on the Saraji Mine.
11 April 2025
SARAJI EAST COAL PROJECT – MINE INFRASTRUCTURE AREA
For the provision of a mine infrastructure area.
11 April 2025
SARAJI EAST COAL PROJECT – CONVEYOR SYSTEM
For the provision of a conveyor system to deliver coal from the underground portals to the CHPP and product coal to rail loading facilities.
11 April 2025
SARAJI EAST COAL PROJECT – POWERLINE RELOCATION
Relocation of the existing 132kV powerline into a new infrastructure & transport corridor.
11 April 2025
SARAJI EAST COAL PROJECT – RAIL SPUR & BALLOON LOOP & SIGNALLING SYSTEM
For the provision of a new rail spur & balloon loop & signalling system to be located on the site of the existing adjacent Saraji Mine.
11 April 2025
SARAJI EAST COAL PROJECT – UNDERGROUND COAL MINE
A greenfield underground coal mine development located on MLA 70383.
11 April 2025
SARAJI EAST COAL PROJECT
Development of a greenfield underground single-seam mine operation and associated project infrastructure, adjacent the existing Saraji open cut mine. The Project involves the extraction of up to seven million tonnes […]
11 April 2025
SARAJI EAST COAL PROJECT – GAS DRAINAGE BORES
Construction of a network of gas drainage bores.